FCC 11.16 Revised as of October 1, 2014
Goto Year:2013 |
2015
§ 11.16 National Control Point Procedures.
The National Control Point Procedures are written instructions issued
by the FCC to national level EAS control points. The procedures are
divided into sections as follows:
(a) National Level EAS Activation. This section contains the activation
and termination instructions for Presidential messages.
(b) EAS Test Transmissions. This section contains the instructions for
testing the EAS at the National level.
(c) National Information Center (NIC). This section contains
instructions for distributing United States Government official
information messages after completion of the National Level EAS
activation and termination actions.
[ 59 FR 67092 , Dec. 28, 1994, as amended at 67 FR 18508 , Apr. 16, 2002]
return arrow Back to Top
CiteFind - See documents on FCC website that
cite this rule
Want to support this service?
Thanks!
Report errors in
this rule. Since these rules are converted to HTML by machine, it's possible errors have been made. Please
help us improve these rules by clicking the Report FCC Rule Errors link to report an error.