FCC 22.951 Revised as of October 1, 2014
Goto Year:2013 |
2015
§ 22.951 Minimum coverage requirement.
Applications for authority to operate a new cellular system in an
unserved area, other than those filed by the licensee of an existing
system that abuts the unserved area, must propose a contiguous cellular
geographical service area (CGSA) of at least 130 square kilometers (50
square miles). Area within contract SAB extensions counts toward the
minimum coverage requirement. However, area within de minimis SAB
extensions does not count toward the minimum coverage requirement.
Applications for authority to operate a new cellular system in an
unserved area, other than those filed by the licensee of an existing
system that abuts the unserved area, must not propose coverage of water
areas only (or water areas and uninhabited islands or reefs only),
except for unserved areas in the Gulf of Mexico MSA.
return arrow Back to Top
CiteFind - See documents on FCC website that
cite this rule
Want to support this service?
Thanks!
Report errors in
this rule. Since these rules are converted to HTML by machine, it's possible errors have been made. Please
help us improve these rules by clicking the Report FCC Rule Errors link to report an error.