FCC 25.217 Revised as of October 1, 2014
Goto Year:2013 |
2015
§ 25.217 Default service rules.
(a) The technical rules in this section apply only to licenses to
operate a satellite system in a frequency band granted after a domestic
frequency allocation has been adopted for that frequency band, but
before any frequency-band-specific service rules have been adopted for
that frequency band.
(b)(1) For all NGSO-like satellite licenses for which the application
was filed pursuant to the procedures set forth in § 25.157 after August
27, 2003, authorizing operations in a frequency band for which the
Commission has not adopted frequency band-specific service rules at the
time the license is granted, the licensee will be required to comply
with the following technical requirements, notwithstanding the
frequency bands specified in these rule provisions: § § 25.142(d),
25.143(b)(2)(ii), 25.143(b)(2)(iii), 25.204(e), 25.210(d), 25.210(f),
and 25.210(i).
(2) In addition to the requirements set forth in paragraph (b)(1) of
this section, the Commission will coordinate with the National
Telecommunications and Information Administration (NTIA) regarding the
operations of any licensees authorized to operate in a shared
government/non-government frequency band, pursuant to the procedure set
forth in § 25.142(b)(2)(ii).
(3) Mobile earth station licensees authorized to operate with one or
more space stations subject to paragraph (b)(1) of this section must
comply with the requirements in § § 25.285 and 25.287, notwithstanding
the frequency bands specified in those sections. In addition, earth
station licensees authorized to operate with one or more space stations
described in paragraph (b)(1) of this section in frequency bands shared
with terrestrial wireless services shall comply with the requirements
in § 25.203(c).
(c)(1) For all GSO-like satellite licenses for which the application
was filed pursuant to the procedures set forth in § 25.158 after August
27, 2003, authorizing operations in a frequency band for which the
Commission has not adopted frequency band-specific service rules at the
time the license is granted, the licensee will be required to comply
with the following technical requirements, notwithstanding the
frequency bands specified in these rule provisions: § § 25.142(d),
25.143(b)(2)(iv), 25.204(e), 25.210(d), 25.210(f), 25.210(i), and
25.210(j).
(2) In addition to the requirements set forth in paragraph (c)(1) of
this section, the Commission will coordinate with the National
Telecommunications and Information Administration (NTIA) regarding the
operations of any licensees authorized to operate in a shared
government/non-government frequency band, pursuant to the procedure set
forth in § 25.142(b)(2)(ii).
(3) Earth station licensees authorized to operate with one or more
space stations described in paragraph (c)(1) of this section shall
comply with the earth station antenna performance verification
requirements in § 25.132, and the antenna gain pattern requirements in
§ 25.209(a) and (b). In addition, earth station licensees authorized to
operate with one or more space stations described in paragraph (c)(1)
of this paragraph in frequency bands shared with terrestrial wireless
services shall comply with the requirements in § 25.203(c).
(4) In addition to the requirements set forth in paragraph (c)(3) of
this section, earth station licensees with a gain equivalent or higher
than the gain of a 1.2 meter antenna operating in the 14.0-14.5 GHz
band, authorized to operate with one or more space stations described
in paragraph (c)(1) of this paragraph in frequency bands greater than
14.5 GHz shall be required to comply with the antenna input power
density requirements set forth in § 25.212(c).
(d) [Reserved]
(e) In the event that the Commission adopts frequency band-specific
service rules for a particular frequency band after it has granted one
or more space station or earth station licenses for operations in that
frequency band, those licensees will be required to come into
compliance with the frequency band-specific service rules within 30
days of the effective date of those rules, unless otherwise specified
by either Commission or Bureau Order.
[ 68 FR 51508 , Aug. 27, 2003, as amended at 70 FR 59277 , Oct. 12, 2005;
79 FR 8323 , Feb. 12, 2014]
return arrow Back to Top
CiteFind - See documents on FCC website that
cite this rule
Want to support this service?
Thanks!
Report errors in
this rule. Since these rules are converted to HTML by machine, it's possible errors have been made. Please
help us improve these rules by clicking the Report FCC Rule Errors link to report an error.