FCC 73.751 Revised as of October 1, 2014
Goto Year:2013 |
2015
§ 73.751 Operating power.
No international broadcast station shall be authorized to install, or
be licensed for operation of, transmitter equipment with:
(a) A rated carrier power of less than 50 kilowatts (kW) if
double-sideband (DSB) modulation is used,
(b) A peak envelope power of less than 50 kW if single-sideband (SSB)
modulation is used, or
(c) A mean power of less than 10 kW if digital modulation is used.
[ 70 FR 46676 , Aug. 10, 2005]
return arrow Back to Top
CiteFind - See documents on FCC website that
cite this rule
Want to support this service?
Thanks!
Report errors in
this rule. Since these rules are converted to HTML by machine, it's possible errors have been made. Please
help us improve these rules by clicking the Report FCC Rule Errors link to report an error.