Goto Section: 90.311 | 90.315 | Table of Contents
FCC 90.313
Revised as of September 29, 2014
Goto Year:2013 |
2015
§ 90.313 Frequency loading criteria.
(a) Except as provided for in paragraph (b) of this section, the
maximum channel loading on frequencies in the 470-512 MHz band is as
follows:
(1) 50 units for systems eligible in the Public Safety Pool (see
§ 90.20(a)).
(2) 90 units for systems eligible in the Industrial/Business Pool (see
§ 90.35(a)).
(b) If a licensee has exclusive use of a frequency, then the loading
standards in paragraph (a) of this section, may be exceeded. If it is a
shared channel, the loading standards can be exceeded upon submission
of a signed statement by all those sharing the channel agreeing to the
increase.
(c) A unit is defined as a mobile transmitter-receiver. Loading
standards will be applied in terms of the number of units actually in
use or to be placed in use within 8 months following authorization. A
licensee will be required to show that an assigned frequency pair is at
full capacity before it may be assigned a second or additional
frequency pair. Channel capacity may be reached either by the
requirements of a single licensee or by several users sharing a
channel. Until a channel is loaded to capacity it will be available for
assignment to other users in the same area. A frequency pair may be
reassigned at distances 64 km. (40 mi.), 32 km. (20 mi.) for Channel
15, Chicago; Channel 20, Philadelphia; and Channel 17, Washington, or
more from the location of base stations authorized on that pair without
reference to loading at the point of original installation. Following
authorization, the licensee shall notify the Commission either during
or at the close of the 8 month period of the number of units in
operation. In the Industrial Radio Services, if the base station
facility is to be used by more than a single licensee, the frequency
assigned to it will not be reassigned for use by another facility
within 64 km. (40 mi.) or 32 km. (20 mi.) where applicable for a period
of 12 months, Provided, That the facility is constructed within 90 days
from the date of the first grant, meets the loading standards to at
least 50 percent within 9 months, and meets all loading standards
within 12 months.
[ 43 FR 54791 , Nov. 22, 1978, as amended at 47 FR 36649 , Aug. 23, 1982;
62 FR 18933 , Apr. 17, 1997]
return arrow Back to Top
Goto Section: 90.311 | 90.315
Goto Year: 2013 |
2015
CiteFind - See documents on FCC website that
cite this rule
Want to support this service?
Thanks!
Report errors in
this rule. Since these rules are converted to HTML by machine, it's possible errors have been made. Please
help us improve these rules by clicking the Report FCC Rule Errors link to report an error.
hallikainen.com
Helping make public information public