FCC 90.757 Revised as of September 29, 2014
Goto Year:2013 |
2015
§ 90.757 Construction requirements.
(a) Except as provided in paragraph (b) of this section, a Phase I
non-nationwide licensee that is granted modification of its
authorization to relocate its base station must construct its base
station and place it in operation, or commence service, on all
authorized channels on or before August 15, 1996, or within 12 months
of initial grant date, whichever is later. The authorization of a
licensee that does not construct its base station and place it in
operation, or commence service, by this date, cancels automatically and
must be returned to the Commission.
(b) A Phase I non-nationwide licensee with a base station authorized at
a location north of Line A must construct its base station and place it
in operation, or commence service, on all authorized channels within 12
months of initial grant date, or within 12 months of the date of the
release of the terms of an agreement between the United States and
Canadian governments on the sharing of 220-222 MHz spectrum between the
two countries, whichever is later. The authorization of a licensee that
does not construct its base station and place it in operation, or
commence service, by this date, cancels automatically and must be
returned to the Commission.
[ 61 FR 3845 , Feb. 2, 1996]
return arrow Back to Top
Policies Governing the Licensing and Use of Phase II EA, Regional and
Nationwide Systems
Source: 62 FR 15998 , 15999, Apr. 3, 1997, unless otherwise noted.
return arrow Back to Top
CiteFind - See documents on FCC website that
cite this rule
Want to support this service?
Thanks!
Report errors in
this rule. Since these rules are converted to HTML by machine, it's possible errors have been made. Please
help us improve these rules by clicking the Report FCC Rule Errors link to report an error.