Goto Section: 15.507 | 15.510 | Table of Contents

FCC 15.509
Revised as of October 2, 2015
Goto Year:2014 | 2016
§ 15.509   Technical requirements for ground penetrating radars and wall imaging
systems.

   (a) The UWB bandwidth of an imaging system operating under the provisions of
   this section must be below 10.6 GHz.

   (b) Operation under the provisions of this section is limited to GPRs and
   wall imaging systems operated for purposes associated with law enforcement,
   fire fighting, emergency rescue, scientific research, commercial mining, or
   construction.

   (1) Parties operating this equipment must be eligible for licensing under
   the provisions of part 90 of this chapter.

   (2)  The  operation  of  imaging  systems  under this section requires
   coordination, as detailed in § 15.525.

   (c) A GPR that is designed to be operated while being hand held and a wall
   imaging system shall contain a manually operated switch that causes the
   transmitter to cease operation within 10 seconds of being released by the
   operator.  In  lieu  of  a switch located on the imaging system, it is
   permissible to operate an imaging system by remote control provided the
   imaging system ceases transmission within 10 seconds of the remote switch
   being released by the operator.

   (d) The radiated emissions at or below 960 MHz from a device operating under
   the provisions of this section shall not exceed the emission levels in
   § 15.209. The radiated emissions above 960 MHz from a device operating under
   the provisions of this section shall not exceed the following average limits
   when measured using a resolution bandwidth of 1 MHz:
   Frequency in MHz EIRP in dBm
   960-1610               -65.3
   1610-1990              -53.3
   1990-3100              -51.3
   3100-10600             -41.3
   Above 10600             -51.3

   (e) In addition to the radiated emission limits specified in the table in
   paragraph  (d)  of  this section, UWB transmitters operating under the
   provisions of this section shall not exceed the following average limits
   when measured using a resolution bandwidth of no less than 1 kHz:
   Frequency in MHz EIRP in dBm
   1164-1240              -75.3
   1559-1610               -75.3

   (f)  For UWB devices where the frequency at which the highest radiated
   emission occurs, fM, is above 960 MHz, there is a limit on the peak level of
   the emissions contained within a 50 MHz bandwidth centered on fM. That limit
   is 0 dBm EIRP. It is acceptable to employ a different resolution bandwidth,
   and  a  correspondingly  different  peak emission limit, following the
   procedures described in § 15.521.

   [ 68 FR 19749 , Apr. 22, 2003]

   return arrow Back to Top


Goto Section: 15.507 | 15.510

Goto Year: 2014 | 2016
CiteFind - See documents on FCC website that cite this rule

Want to support this service?
Thanks!

Report errors in this rule. Since these rules are converted to HTML by machine, it's possible errors have been made. Please help us improve these rules by clicking the Report FCC Rule Errors link to report an error.
hallikainen.com
Helping make public information public