Goto Section: 25.116 | 25.118 | Table of Contents

FCC 25.117
Revised as of October 2, 2015
Goto Year:2014 | 2016
§ 25.117   Modification of station license.

   (a) Except as provided for in § 25.118 (Modifications not requiring prior
   authorization), no modification of a radio station governed by this part
   which  affects  the  parameters or terms and conditions of the station
   authorization shall be made except upon application to and grant of such
   application by the Commission.

   (b) Both earth station and space station modification applications must be
   filed electronically through the International Bureau Filing System (IBFS)
   in accordance with the applicable provisions of part 1, subpart Y of this
   chapter.

   (c) Applications for modification of earth station authorizations must be
   submitted  on FCC Form 312, Main Form and Schedule B. Applications for
   modification of space station authorizations must be submitted on FCC Form
   312, Main Form and Schedule S. Only those items that change need to be
   specified,  provided  that  the applicant certifies that the remaining
   information has not changed.

   (d)(1) Except as set forth in § 25.118(e), applications for modifications of
   space station authorizations shall be filed in accordance with § 25.114, but
   only those items of information listed in § 25.114 that change need to be
   submitted, provided the applicant certifies that the remaining information
   has not changed.

   (2) Applications for modifications of space station authorizations will be
   granted except under the following circumstances:

   (i)  Granting the modification would make the applicant unqualified to
   operate a space station under the Commission's rules.

   (ii) Granting the modification request would not serve the public interest,
   convenience, and necessity.

   (iii)  Except  as  set  forth in paragraph (d)(2)(iv) of this section,
   applications for modifications of GSO-like space station authorizations
   granted  pursuant to the procedure set forth in § 25.158, which seek to
   relocate a GSO satellite or add a frequency band to the authorization, will
   be  placed  in  a  queue pursuant to § 25.158 and considered only after
   previously  filed  space station license applications or space station
   modification applications have been considered.

   (iv) Applications for modifications of space station authorizations to
   increase the authorized bandwidth will not be considered in cases in which
   the  original  space station authorization was granted pursuant to the
   procedures set forth in § 25.157(e) or § 25.158(c)(4).

   (v) Any 17/24 GHz BSS space station operator whose license is conditioned to
   operate at less than the power level otherwise permitted by § 25.208(c)
   and/or (w) of this part, and is conditioned to accept interference from a
   neighboring 17/24 GHz BSS space station, may file a modification application
   to  remove those two conditions in the event that the license for that
   neighboring space station is cancelled or surrendered. In the event that two
   or more such modification applications are filed, and those applications are
   mutually exclusive, the modification applications will be considered on a
   first-come,  first-served basis pursuant to the procedure set forth in
   § 25.158 of this part.

   (3) In the event that a space station licensee provides notification of a
   planned license modification pursuant to § 25.118(e), and the Commission
   finds that the proposed modification does not meet the requirements of
   § 25.118(e), the Commission will issue a public notice announcing that the
   proposed license modification will be considered pursuant to the procedure
   specified in paragraphs (d)(1) and (d)(2) of this section.

   (e) Any application for modification of authorization to extend a required
   date of completion, as set forth in § 25.133 for earth station authorizations
   or § 25.164 for space stations, or included as a condition of any earth
   station or space station authorization, must include a verified statement
   from the applicant:

   (1) That states that the additional time is required due to unforeseeable
   circumstances beyond the applicant's control, describes these circumstances
   with specificity, and justifies the precise extension period requested; or

   (2) That states there are unique and overriding public interest concerns
   that  justify an extension, identifies these interests and justifies a
   precise extension period (f) An application for modification of a space
   station license to add an ancillary terrestrial component to an eligible
   satellite network will be treated as a request for a minor modification if
   the particulars of operations provided by the applicant comply with the
   criteria specified in § 25.149. Notwithstanding the treatment of such an
   application as a minor modification, the Commission shall place any initial
   application  for the modification of a space station license to add an
   ancillary terrestrial component on notice for public comment. Except as
   provided for in § 25.149(f), no application for authority to add an ancillary
   terrestrial component to an eligible satellite network shall be granted
   until the applicant has demonstrated actual compliance with the criteria
   specified in § 25.149(b).

   (g)  In  cases  where  an  earth  station licensee proposes additional
   transmitters, facilities, or modifications, the resulting transmissions of
   which can reasonably be expected to cause the power density to exceed the RF
   exposure limits specified in part 1, subpart I of this chapter by five
   percent, the licensee must submit an environmental assessment pursuant to
   § 1.1307(b)(3)(i)  of this chapter as an attachment to its modification
   application.

   [ 56 FR 24016 , May 28, 1991, as amended at  61 FR 9952 , Mar. 12, 1996;  62 FR 5928 , Feb. 10, 1997;  68 FR 33649 , June 5, 2003;  68 FR 47858 , Aug. 12, 2003;
    68 FR 51503 , Aug. 27, 2003;  68 FR 62248 , Nov. 3, 2003;  68 FR 63998 , Nov. 12,
   2003;  69 FR 47794 , Aug. 6, 2004;  70 FR 32253 , June 2, 2005;  72 FR 60279 ,
   Oct. 24, 2007;  78 FR 8421 , Feb. 6, 2013]

   return arrow Back to Top


Goto Section: 25.116 | 25.118

Goto Year: 2014 | 2016
CiteFind - See documents on FCC website that cite this rule

Want to support this service?
Thanks!

Report errors in this rule. Since these rules are converted to HTML by machine, it's possible errors have been made. Please help us improve these rules by clicking the Report FCC Rule Errors link to report an error.
hallikainen.com
Helping make public information public