Goto Section: 27.54 | 27.56 | Table of Contents

FCC 27.55
Revised as of October 2, 2015
Goto Year:2014 | 2016
§ 27.55   Power strength limits.

   (a)  Field  strength limits. For the following bands, the predicted or
   measured median field strength at any location on the geographical border of
   a licensee's service area shall not exceed the value specified unless the
   adjacent affected service area licensee(s) agree(s) to a different field
   strength. This value applies to both the initially offered service areas and
   to partitioned service areas.

   (1) 1995-2000 MHz, 2110-2155, 2155-2180, 2180-2200, 2305-2320, and 2345-2360
   MHz bands: 47 dBµV/m.

   (2) 600 MHz, 698-758, and 775-787 MHz bands: 40 dBµV/m.

   (3)  The paired 1392-1395 MHz and 1432-1435 MHz bands and the unpaired
   1390-1392 MHz band (1.4 GHz band): 47 dBµV/m.

   (4) BRS and EB§  The predicted or measured median field strength at any
   location on the geographical border of a licensee's service area shall not
   exceed  the  value specified unless the adjacent affected service area
   licensee(s) agree(s) to a different field strength. This value applies to
   both the initially offered services areas and to partitioned services areas.
   Licensees may exceed this signal level where there is no affected licensee
   that is constructed and providing service. Once the affected licensee is
   providing service, the original licensee will be required to take whatever
   steps  necessary  to comply with the applicable power level at its GSA
   boundary, absent consent from the affected licensee.

   (i)  Prior  to  transition, the signal strength at any point along the
   licensee's GSA boundary does not exceed the greater of that permitted under
   the  licensee's Commission authorizations as of January 10, 2005 or 47
   dBµV/m.

   (ii) Following transition, for stations in the LBS and UBS, the signal
   strength at any point along the licensee's GSA boundary must not exceed 47
   dBµV/m. This field strength is to be measured at 1.5 meters above the ground
   over the channel bandwidth (i.e., each 5.5 MHz channel for licensees that
   hold a full channel block, and for the 5.5 MHz channel for licensees that
   hold individual channels).

   (iii) Following transition, for stations in the MBS, the signal strength at
   any point along the licensee's GSA boundary must not exceed the greater of
   −73.0 + 10 log(X/6) dBW/m2, where X is the bandwidth in megahertz of the
   channel, or for facilities that are substantially similar to the licensee's
   pre-transition facilities (including modifications that do not alter the
   fundamental nature or use of the transmissions), the signal strength at such
   point that resulted from the station's operations immediately prior to the
   transition, provided that such operations complied with paragraph (a)(4)(i)
   of this section.

   (b) Power flux density limit for stations operating in the 698-746 MHz
   bands. For base and fixed stations operating in the 698-746 MHz band in
   accordance with the provisions of § 27.50(c)(6), the power flux density that
   would be produced by such stations through a combination of antenna height
   and vertical gain pattern must not exceed 3000 microwatts per square meter
   on the ground over the area extending to 1 km from the base of the antenna
   mounting structure.

   (c) Power flux density limit for stations operating in the 746-757 MHz and
   776-787 MHz bands. For base and fixed stations operating in the 746-757 MHz
   and 776-787 MHz bands in accordance with the provisions of § 27.50(b)(6), the
   power  flux  density that would be produced by such stations through a
   combination of antenna height and vertical gain pattern must not exceed 3000
   microwatts per square meter on the ground over the area extending to 1 km
   from the base of the antenna mounting structure.

   [ 69 FR 5715 , Feb. 6, 2004, as amended at  69 FR 72034 , Dec. 10, 2004;  72 FR 27712 , May 16, 2007;  72 FR 48852 , Aug. 24, 2007;  73 FR 26040 , May 8, 2008;
    78 FR 8270 , Feb. 5, 2013;  78 FR 50256 , Aug. 16, 2013;  79 FR 599 , Jan. 6,
   2014;  79 FR 32413 , June 4, 2014;  79 FR 48539 , Aug. 15, 2014]

   return arrow Back to Top


Goto Section: 27.54 | 27.56

Goto Year: 2014 | 2016
CiteFind - See documents on FCC website that cite this rule

Want to support this service?
Thanks!

Report errors in this rule. Since these rules are converted to HTML by machine, it's possible errors have been made. Please help us improve these rules by clicking the Report FCC Rule Errors link to report an error.
hallikainen.com
Helping make public information public