Goto Section: 73.58 | 73.62 | Table of Contents
FCC 73.61
Revised as of October 1, 2016
Goto Year:2015 |
    2017
  § 73.61   AM directional antenna field strength measurements.
   (a) Each AM station using a directional antenna with monitoring point
   locations specified in the instrument of authorization must make field
   strength measurements as often as necessary to ensure that the field at
   each of those points does not exceed the value specified in the station
   authorization. Additionally, stations not having an approved sampling
   system must make the measurements once each calendar quarter at
   intervals not exceeding 120 days. The provision of this paragraph
   supersedes any schedule specified on a station license issued prior to
   January 1, 1986. The results of the measurements are to be entered into
   the station log pursuant to the provisions of § 73.1820.
   (b) If the AM license was granted on the basis of field strength
   measurements performed pursuant to § 73.151(a), partial proof of
   performance measurements using the procedures described in § 73.154 must
   be made whenever the licensee has reason to believe that the radiated
   field may be exceeding the limits for which the station was most
   recently authorized to operate.
   (c) A station may be directed to make a partial proof of performance by
   the FCC whenever there is an indication that the antenna is not
   operating as authorized.
   [ 50 FR 47054 , Nov. 14, 1985, as amended at  73 FR 64560 , Oct. 30, 2008]
   return arrow Back to Top
Goto Section: 73.58 | 73.62
Goto Year: 2015 |
    2017
CiteFind - See documents on FCC website that
    cite this rule
Want to support this service?
     Thanks!
Report errors in
    this rule. Since these rules are converted to HTML by machine, it's possible errors have been made. Please
    help us improve these rules by clicking the Report FCC Rule Errors link to report an error.
    
    hallikainen.com
    Helping make public information public