Goto Section: 90.669 | 90.672 | Table of Contents

FCC 90.671
Revised as of December 4, 2012
Goto Year:2011 | 2013
§  90.671   Field strength limits.

   The predicted or measured field strength at any location on the border
   of the MTA service area for MTA licensees shall not exceed 40 dBuV/m
   unless all bordering MTA licensees agree to a higher field strength.
   MTA licensees are also required to coordinate their frequency usage
   with so-channel adjacent MTA licensees and all other affected parties.
   To the extent that a single entity obtains licenses for adjacent MTAs
   on the same channel block, it will not be required to coordinate its
   operations in this manner. In the event that this standard conflicts
   with the MTA licensee's obligation to provide co-channel protection to
   incumbent licensees under §  90.621(b), the requirements of §  90.621(b)
   shall prevail.

   [ 60 FR 21992 , May 4, 1995]

   return arrow Back to Top

Procedures and Process—Unacceptable Interference

   return arrow Back to Top


Goto Section: 90.669 | 90.672

Goto Year: 2011 | 2013
CiteFind - See documents on FCC website that cite this rule

Want to support this service?
Thanks!

Report errors in this rule. Since these rules are converted to HTML by machine, it's possible errors have been made. Please help us improve these rules by clicking the Report FCC Rule Errors link to report an error.
hallikainen.com
Helping make public information public