Goto Section: 22.501 | 22.507 | Table of Contents

FCC 22.503
Revised as of October 1, 2013
Goto Year:2012 | 2014
§  22.503   Paging geographic area authorizations.

   The FCC considers applications for and issues paging geographic area
   authorizations in the Paging and Radiotelephone Service in accordance
   with the rules in this section. Each paging geographic area
   authorization contains conditions requiring compliance with paragraphs
   (h) and (i) of this section.

   (a) Channels. The FCC may issue a paging geographic area authorization
   for any channel listed in §  22.531 of this part or for any channel
   pair listed in §  22.561 of this part.

   (b) Paging geographic areas. The paging geographic areas are as
   follows:

   (1) The Nationwide paging geographic area comprises the District of
   Columbia and all States, Territories and possessions of the United
   States of America.

   (2) Major Economic Areas (MEAs) and Economic Areas (EAs) are defined
   below. EAs are defined by the Department of Commerce, Bureau of
   Economic Analysis. See Final Redefinition of the MEA Economic Areas,  60 FR 13114  (March 10, 1995). MEAs are based on EAs. In addition to the
   Department of Commerce's 172 EAs, the FCC shall separately license Guam
   and the Northern Mariana Islands, Puerto Rico and the United States
   Virgin Islands, and American Samoa, which have been assigned
   FCC-created EA numbers 173-175, respectively, and MEA numbers 49-51,
   respectively.

   (3) The 51 MEAs are composed of one or more EAs as defined in the
   following table:
                      MEAs                                  EAs
   1 (Boston)                                  1-3.
   2 (New York City)                           4-7, 10.
   3 (Buffalo)                                 8.
   4 (Philadelphia)                            11-12.
   5 (Washington)                              13-14.
   6 (Richmond)                                15-17, 20.
   7 (Charlotte-Greensboro-Greenville-Raleigh) 18-19, 21-26, 41-42, 46.
   8 (Atlanta)                                 27-28, 37-40, 43.
   9 (Jacksonville)                            29, 35.
   10 (Tampa-St. Petersburg-Orlando)           30, 33-34.
   11 (Miami)                                  31-32.
   12 (Pittsburgh)                             9, 52-53.
   13 (Cincinnati-Dayton)                      48-50.
   14 (Columbus)                               51.
   15 (Cleveland)                              54-55.
   16 (Detroit)                                56-58, 61-62.
   17 (Milwaukee)                              59-60, 63, 104-105, 108.
   18 (Chicago)                                64-66, 68, 97, 101.
   19 (Indianapolis)                           67.
   20 (Minneapolis-St. Paul)                   106-107, 109-114, 116.
   21 (Des Moines-Quad Cities)                 100, 102-103, 117.
   22 (Knoxville)                              44-45.
   23 (Louisville-Lexington-Evansville)        47, 69-70, 72.
   24 (Birmingham)                             36, 74, 78-79.
   25 (Nashville)                              71.
   26 (Memphis-Jackson)                        73, 75-77.
   27 (New Orleans-Baton Rouge)                80-85.
   28 (Little Rock)                            90-92, 95.
   29 (Kansas City)                            93, 99, 123.
   30 (St. Louis)                              94, 96, 98.
   31 (Houston)                                86-87, 131.
   32 (Dallas-Fort Worth)                      88-89, 127-130, 135, 137-138.
   33 (Denver)                                 115, 140-143.
   34 (Omaha)                                  118-121.
   35 (Wichita)                                122.
   36 (Tulsa)                                  124.
   37 (Oklahoma City)                          125-126.
   38 (San Antonio)                            132-134.
   39 (El Paso-Albuquerque)                    136, 139, 155-157.
   40 (Phoenix)                                154, 158-159.
   41 (Spokane-Billings)                       144-147, 168.
   42 (Salt Lake City)                         148-150, 152.
   43 (San Francisco-Oakland-San Jose)         151, 162-165.
   44 (Los Angeles-San Diego)                  153, 160-161.
   45 (Portland)                               166-167.
   46 (Seattle)                                169-170.
   47 (Alaska)                                 171.
   48 (Hawaii)                                 172.
   49 (Guam and the Northern Mariana Islands)  173.
   50 (Puerto Rico and U.S. Virgin Islands)    174.
   51 (American Samoa)                         175.

   (c) Availability. The FCC may determine whether to issue a paging
   geographic area authorization for any specific channel or channel pair
   in any specific paging geographic area. The FCC may replace existing
   site specific authorizations for facilities on a channel or channel
   pair located in a paging geographic area with a paging geographic area
   authorization for that channel or channel pair, if in its sole
   discretion, the FCC determines that the public interest would be served
   by such replacement.

   (d) Filing windows. The FCC accepts applications for paging geographic
   area authorizations only during filing windows. The FCC issues Public
   Notices announcing in advance the dates of the filing windows, and the
   specific paging geographic areas and channels for which applications
   may be accepted.

   (e) One grant per geographic area. The FCC may grant one and only one
   application for a paging geographic area authorization for any specific
   channel or channel pair in any specific paging geographic area defined
   in paragraph (b) of this section. Selection from among mutually
   exclusive applications for a paging geographic area authorization will
   be made in accordance with the procedures in § §  22.131 and 22.200
   through 22.299. If after the selection process but prior to filing a
   "long form" application, a successful bidder decides to partition the
   paging geographic area, the FCC may require and accept multiple "long
   form" applications from the consortium members.

   (f) Exclusive right to expand. During the term of a paging geographic
   area authorization, the FCC does not accept, from anyone other than the
   paging geographic area licensee, any major application for
   authorization to operate a facility that would serve unserved area
   within the paging geographic area specified in that paging geographic
   area authorization, on the channel specified in that paging geographic
   area authorization, unless any extension of the interfering contour of
   the proposed facility falls:

   (1) Within the composite interfering contour of another licensee; or,

   (2) Into unserved area and the paging geographic area licensee consents
   to such extension.

   (g) Subsequent applications not accepted. During the term of a paging
   geographic area authorization, the FCC does not accept any application
   for authorization relating to a facility that is or would be located
   within the paging geographic area specified in that paging geographic
   area authorization, on the channel specified in that paging geographic
   area authorization, except in the following situations:

   (1) FCC grant of an application authorizing the construction of the
   facility could have a significant environmental effect as defined by
   §  1.1307 of this chapter. See §  22.115(a)(5).

   (2) Specific international coordination procedures are required, prior
   to assignment of a channel to the facility, pursuant to a treaty or
   other agreement between the United States government and the government
   of Canada or Mexico. See §  22.169.

   (3) The paging geographic area licensee or another licensee of a system
   within the paging geographic area applies to assign its authorization
   or for FCC consent to a transfer of control.

   (h) Adjacent geographic area coordination required. Before constructing
   a facility for which the interfering contour (as defined in §  22.537
   or §  22.567 of this part, as appropriate for the channel involved)
   would extend into another paging geographic area, a paging geographic
   area licensee must obtain the consent of the relevant co-channel paging
   geographic area licensee, if any, into whose area the interfering
   contour would extend. Licensees are expected to cooperate fully and in
   good faith attempt to resolve potential interference problems before
   bringing matters to the FCC. In the event that there is no co-channel
   paging geographic area licensee from whom to obtain consent in the area
   into which the interfering contour would extend, the facility may be
   constructed and operated subject to the condition that, at such time as
   the FCC issues a paging geographic area authorization for that adjacent
   geographic area, either consent must be obtained or the facility
   modified or eliminated such that the interfering contour no longer
   extends into the adjacent geographic area.

   (i) Protection of existing service. All facilities constructed and
   operated pursuant to a paging geographic area authorization must
   provide co-channel interference protection in accordance with §  22.537
   or §  22.567, as appropriate for the channel involved, to all
   authorized co-channel facilities of exclusive licensees within the
   paging geographic area. Non-exclusive licensees on the thirty-five
   exclusive 929 MHz channels are not entitled to exclusive status, and
   will continue to operate under the sharing arrangements established
   with the exclusive licensees and other non-exclusive licensees that
   were in effect prior to February 19, 1997. MEA, EA, and nationwide
   geographic area licensees have the right to share with non-exclusive
   licensees on the thirty-five exclusive 929 MHz channels on a
   non-interfering basis.

   (j) Site location restriction. The transmitting antenna of each
   facility constructed and operated pursuant to a paging geographic area
   authorization must be located within the paging geographic area
   specified in the authorization.

   (k) Coverage requirements. Failure by an MEA or EA licensee to meet
   either the coverage requirements in paragraphs (k)(1) and (k)(2) of
   this section, or alternatively, the substantial service requirement in
   paragraph (k)(3) of this section, will result in automatic termination
   of authorizations for those facilities that were not authorized,
   constructed, and operating at the time the geographic area
   authorization was granted. MEA and EA licensees have the burden of
   showing when their facilities were authorized, constructed, and
   operating, and should retain necessary records of these sites until
   coverage requirements are fulfilled. For the purpose of this paragraph,
   to "cover" area means to include geographic area within the composite
   of the service contour(s) determined by the methods of § §  22.537 or
   22.567 as appropriate for the particular channel involved. Licensees
   may determine the population of geographic areas included within their
   service contours using either the 1990 census or the 2000 census, but
   not both.

   (1) No later than three years after the initial grant of an MEA or EA
   geographic area authorization, the licensee must construct or otherwise
   acquire and operate sufficient facilities to cover one third of the
   population in the paging geographic area. The licensee must notify the
   FCC at the end of the three-year period pursuant to §  1.946 of this
   chapter, either that it has satisfied this requirement or that it plans
   to satisfy the alternative requirement to provide substantial service
   in accordance with paragraph (k)(3) of this section.

   (2) No later than five years after the initial grant of an MEA or EA
   geographic area authorization, the licensee must construct or otherwise
   acquire and operate sufficient facilities to cover two thirds of the
   population in the paging geographic area. The licensee must notify the
   FCC at the end of the five year period pursuant to §  1.946 of this
   chapter, either that it has satisfied this requirement or that it has
   satisfied the alternative requirement to provide substantial service in
   accordance with paragraph (k)(3) of this section.

   (3) As an alternative to the coverage requirements of paragraphs (k)(1)
   and (k)(2) of this section, the paging geographic area licensee may
   demonstrate that, no later than five years after the initial grant of
   its paging geographic area authorization, it provides substantial
   service to the paging geographic area. "Substantial service" means
   service that is sound, favorable, and substantially above a level of
   mediocre service that would barely warrant renewal.

   [ 62 FR 11633 , Mar. 12, 1997, as amended at  63 FR 68945 , Dec. 14, 1998;
    64 FR 33782 , June 24, 1999]

   return arrow Back to Top


Goto Section: 22.501 | 22.507

Goto Year: 2012 | 2014
CiteFind - See documents on FCC website that cite this rule

Want to support this service?
Thanks!

Report errors in this rule. Since these rules are converted to HTML by machine, it's possible errors have been made. Please help us improve these rules by clicking the Report FCC Rule Errors link to report an error.
hallikainen.com
Helping make public information public