FCC 25.282 Revised as of October 1, 2013
Goto Year:2012 |
2014
§ 25.282 Orbit raising maneuvers.
A space station authorized to operate in the geostationary satellite
orbit under this part is also authorized to transmit in connection with
short-term, transitory maneuvers directly related to post-launch,
orbit-raising maneuvers, provided that the following conditions are
met:
(a) Authority is limited to those tracking, telemetry, and control
frequencies in which the space station is authorized to operate once it
reaches its assigned geostationary orbital location;
(b) In the event that any unacceptable interference does occur, the
space station licensee shall cease operations until the issue is
rectified;
(c) The space station licensee is required to accept interference from
any lawfully operating satellite network or radio communication system.
[ 69 FR 54587 , Sept. 9, 2004]
return arrow Back to Top
CiteFind - See documents on FCC website that
cite this rule
Want to support this service?
Thanks!
Report errors in
this rule. Since these rules are converted to HTML by machine, it's possible errors have been made. Please
help us improve these rules by clicking the Report FCC Rule Errors link to report an error.