Goto Section: 73.1670 | 73.1680 | Table of Contents

FCC 73.1675
Revised as of October 1, 2013
Goto Year:2012 | 2014
§  73.1675   Auxiliary antennas.

   (a)(1) An auxiliary antenna is one that is permanently installed and
   available for use when the main antenna is out of service for repairs
   or replacement. An auxiliary antenna may be located at the same
   transmitter site as the station's main antenna or at a separate site.
   The service contour of the auxiliary antenna may not extend beyond the
   following corresponding contour for the main facility:

   (i) AM stations: The 0.5 mV/m field strength contours.

   (ii) FM stations: The 1.0 mV/m field strength contours.

   (iii) TV stations: The Grade B coverage contours.

   (iv) Class A TV stations: The protected contours defined in §  73.6010.

   (2) An application for an auxiliary antenna for an AM station filed
   pursuant to paragraphs (b) or (c) of this section must contain a map
   showing the 0.5 mV/m field strength contours of both the main and
   auxiliary facilities.

   (b) An application for a construction permit to install a new auxiliary
   antenna, or to make changes in an existing auxiliary antenna for which
   prior FCC authorization is required (see §  73.1690), must be filed on
   FCC Form 301 (FCC Form 340 for noncommercial educational stations).

   (c)(1) Where an FM, TV or Class A TV licensee proposes to use a
   formerly licensed main facility as an auxiliary facility, or proposes
   to modify a presently authorized auxiliary facility, and no changes in
   the height of the antenna radiation center are required in excess of
   the limits in §  73.1690(c)(1), the FM, TV or Class A TV licensee may
   apply for the proposed auxiliary facility by filing a modification of
   license application. The modified auxiliary facility must operate on
   the same channel as the licensed main facility. An exhibit must be
   provided with this license application to demonstrate compliance with
   §  73.1675(a). All FM, TV and Class A TV licensees may request a
   decrease from the authorized facility's ERP in the license application.
   An FM, TV or Class A TV licensee may also increase the ERP of the
   auxiliary facility in a license modification application, provided the
   application contains an analysis demonstrating compliance with the
   Commission's radiofrequency radiation guidelines, and an analysis
   showing that the auxiliary facility will comply with §  73.1675(a).
   Auxiliary facilities mounted on an AM antenna tower must also
   demonstrate compliance with §  73.1692 in the license application.

   (2) Where an AM licensee proposes to use a former licensed main
   facility as an auxiliary facility with an ERP less than or equal to the
   ERP specified on the former main license, the AM station may apply to
   license the proposed auxiliary facility by filing a modification of
   license application on Form 302-AM. The proposed auxiliary facilities
   must have been previously licensed on the same frequency as the present
   main facility. The license application must contain an exhibit to
   demonstrate compliance with §  73.1675(a).

   [ 43 FR 53741 , Nov. 17, 1978, as amended at  44 FR 22740 , Apr. 17, 1979;
    45 FR 26066 , Apr. 17, 1980;  50 FR 13974 , Apr. 9, 1985;  62 FR 51060 ,
   Sept. 30, 1997;  63 FR 70049 , Dec. 18, 1998;  65 FR 30005 , May 10, 2000]

   return arrow Back to Top


Goto Section: 73.1670 | 73.1680

Goto Year: 2012 | 2014
CiteFind - See documents on FCC website that cite this rule

Want to support this service?
Thanks!

Report errors in this rule. Since these rules are converted to HTML by machine, it's possible errors have been made. Please help us improve these rules by clicking the Report FCC Rule Errors link to report an error.
hallikainen.com
Helping make public information public