FCC 73.509 Revised as of October 1, 2013
Goto Year:2012 |
2014
§ 73.509 Prohibited overlap.
(a) An application for a new or modified NCE-FM station other than a
Class D (secondary) station will not be accepted if the proposed
operation would involve overlap of signal strength contours with any
other station licensed by the Commission and operating in the reserved
band (Channels 200-220, inclusive) as set forth below:
Frequency separation Contour of proposed station Contour of other
station
Co-channel 0.1mV/m (40 dBu)
1 mV/m (60 dBu) 1 mV/m (60 dBu)
0.1 mV/m (40 dBu)
200 kHz 0.5 mV/m (54 dBu)
1 mV/m (60 dBu)1 1 mV/m (60 dBu)
0.5 mV/m (54 dBu)
400 kHz/600 kHz 100 mV/m (100 dBu)
1 mV/m (60 dBu) 1 mV/m (60 dBu)
100 mV/m (100 dBu)
(b) An application by a Class D (secondary) station, other than an
application to change class, will not be accepted if the proposed
operation would involve overlap of signal strength contours with any
other station as set forth below:
Frequency separation Contour of proposed station Contour of any other
station
Co-channel 0.1 mV/m (40 dBu) 1 mV/m (60 dBu).
200 kHz 0.5 mV/m (54 dBu) 1 mV/m (60 dBu).
400 kHz 10 mV/m (80 dBu) 1 mV/m (60 dBu).
600 kHz 100 mV/m (100 dBu) 1 mV/m (60 dBu).
(c) The following standards must be used to compute the distances to
the pertinent contours:
(1) The distance of the 60 dBu (1 mV/m) contours are to be computed
using Figure 1 of § 73.333 [F(50,50) curves] of this part.
(2) The distance to the other contours are to be computed using Figure
1a of § 73.333 [F(50,10) curves]. In the event that the distance to
the contour is below 16 kilometers (approximately 10 miles), and
therefore not covered by Figure 1a, curves in Figure 1 must be used.
(3) The effective radiated power (ERP) that is the maximum ERP for any
elevation plane on any bearing will be used.
(d) An application for a change (other than a change in channel) in the
facilities of a NCE-FM broadcast station will be accepted even though
overlap of signal strength contours, as specified in paragraphs (a) and
(b) of this section, would occur with another station in an area where
such overlap does not already exists, if:
(1) The total area of overlap with that station would not be increased;
(2) The area of overlap with any other station would not increase;
(3) The area of overlap does not move significantly closer to the
station receiving the overlap; and,
(4) No area of overlap would be created with any station with which the
overlap does not now exist.
(e) The provisions of this section concerning prohibited overlap will
not apply where the area of such overlap lies entirely over water.
[ 50 FR 27962 , July 9, 1985, as amended at 52 FR 43765 , Nov. 16, 1987;
65 FR 79778 , Dec. 20, 2000]
return arrow Back to Top
CiteFind - See documents on FCC website that
cite this rule
Want to support this service?
Thanks!
Report errors in
this rule. Since these rules are converted to HTML by machine, it's possible errors have been made. Please
help us improve these rules by clicking the Report FCC Rule Errors link to report an error.